Categories
Uncategorised

Welcome to the ULB CMS GEM webpage

(Be patient this page is under construction)

Introduction

ULB is involved in the CMS GEM project since 2011. The CMS GEM project aims to install new Triple-GEM detectors in the most forward regions of the CMS muon spectrometer. The first station is GE1/1. GE1/1 installation has been completed in October 2020 and the system was under commissioning until now. The commissioning aims at preparing the system for the LHC restart now scheduled for May-June 2022.

Besides GE1/1, the CMS GEM community is now building a second layer of Triple-GEM detectors, GE2/1, very similar to GE1/1, but much bigger. Eventually a third layer, called ME0, will be added during LS3 at higher pseudo-rapidity, behind the new CMS HGCAL.

Longitudinal view of one quadrant of the CMS phase-2 detector
Installation of one GE1/1 Super Chamber in the “nose” of the CMS experiment at CERN LHC (courtesy: B. Regnery).
Archana Sharma, Project Manager of the CMS GEM project (courtesy: A. Sharma)
Left: Trolleys filled of GE1/1 Super-Chambers waiting their shipment from the assembly lab to CMS. Right: Camilla Galloni (University of Wisconsin) and Laurent Pétré (ULB), the GEM DAQ experts at work in the CMS Control Room (courtesy: B. Regnery).

This is a test