(Be patient this page is under construction)
Introduction
ULB is involved in the CMS GEM project since 2011. The CMS GEM project aims to install new Triple-GEM detectors in the most forward regions of the CMS muon spectrometer. The first station is GE1/1. GE1/1 installation has been completed in October 2020 and the system was under commissioning until now. The commissioning aims at preparing the system for the LHC restart now scheduled for May-June 2022.
Besides GE1/1, the CMS GEM community is now building a second layer of Triple-GEM detectors, GE2/1, very similar to GE1/1, but much bigger. Eventually a third layer, called ME0, will be added during LS3 at higher pseudo-rapidity, behind the new CMS HGCAL.




This is a test